Olembe Stadium: Future Pride Of Cameroon

Even though construction work is still going on in Olembe, Cameroonians can already predict what will come out from the gigantic project.

There is no doubt that the Paul Biya Biya Stadium in Olembe which is presently under construction will be among the best stadiums in Africa. From all indications the Olembe Stadium that will host the opening and closing ceremonies of the 2019 Africa Cup of Nations will be the pride of Cameroon. The Olembe Stadium is being constructed by the Italian giant, Piccini Construction. The bird nest shaped stadium, will be constructed on a surface area of 34 hectares in the Olembe neighbourhood in Yaounde, some 13km from the city centre.

The future Olembe Sports Complex will have a capacity of 60,000 seats all covered, two training stadia with 3000 seats each, play grounds for other disciplines; handball, basketball volleyball, tennis, an Olympic swimming pool, a hotel, shopping mall, five restaurants, 6000sqm for VIP hospitality, cinema conference centre and a hall of fame. At the construction site, bull dozers and other heavy duty construction machinery are at work preparing the ground for the giant project; the first fully covered football stadium in the country.

Recently, officials of Piccini and the Italian Embassy to Cameroon assured the public in a press briefing in Yaounde that the football facility will be ready in eighteen months, October 2018. According to the contractor, most work in the site will consist of assembling the pre-cast equipment. Over 60 per cent of parts of the building will be produced in I...

Reactions

Commentaires

    List is empty.

Laissez un Commentaire

De la meme catégorie