Energy Supply: Rationing In Course

The three-day blackout in some communities is result of repair works scheduled for August 5 to 7 at the Kribi gas-fired thermal power plant by SNH.

The Minister of Water and Energy, Gaston Eloun­ dou Essomba, in an August 5, 2026 press release, announced temporary disruptions in electricity supply in certain localities across the country due to maintenance works being done by the National Hydrocarbons Corporation (SNH), from August 5 to 7, 2026 at the Kribi gas-fired thermal power plant. In accordance with technical and safety requirements, the power plant has been exceptionally shut down for the entire pe­ riod, consequently leading to a temporary re­ duction in the generation capacity of the Southern Interconnected Grid. While the repairs promise sustainable solutions in the long run, the current blackouts in certain communities around Cameroon, will take a toll on local business owners...

Reactions

Commentaires

    List is empty.

Laissez un Commentaire

De la meme catégorie